Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 87 results ...

Aalami, F B (1998) Using construction method models to generate four-dimensional production models, Unpublished PhD Thesis, , Stanford University.

Abraham, K A (2015) Influencing the design decision process: Information visualization in multi-criteria decision support systems for early-stage building design, Unpublished PhD Thesis, , Stanford University.

Akbas, R (2003) Geometry-based modeling and simulation of construction processes, Unpublished PhD Thesis, , Stanford University.

Akinci, B H (2000) Automatic generation of work spaces and analysis of time-space conflicts at construction sites, Unpublished PhD Thesis, , Stanford University.

Arnold, J A (2000) Information interoperation for internet-based component engineering analysis, Unpublished PhD Thesis, , Stanford University.

Benjamin, N B H (1969) Competitive bidding for building construction contracts, Unpublished PhD Thesis, , Stanford University.

Boice, J R (1970) A history and evaluation of the school construction systems development project, 1961-1967, Unpublished PhD Thesis, , Stanford University.

Bowen, R M (1978) Valuation of capitalized interest on construction expenditures in the electric utility industry, Unpublished PhD Thesis, , Stanford University.

Broemser, G M (1968) Competitive bidding in the construction industry, Unpublished PhD Thesis, , Stanford University.

Carr, R I J (1971) Synthesis of uncertainty in construction planning, Unpublished PhD Thesis, , Stanford University.

Casady, C B (2019) Assessing public-private partnership (PPP) governance, institutionalization, and market maturity in the United States and abroad, Unpublished PhD Thesis, , Stanford University.

Chan, C H F (2010) To talk or to fight? Collective effects of strategic, cultural, and institutional factors on investors' renegotiation approach in public-private concessions, Unpublished PhD Thesis, , Stanford University.

Chen, S (2013) Scheduling, contracting, and capacity planning in project-based supply chains, Unpublished PhD Thesis, , Stanford University.

Cheng, J (2005) A simulation access language and framework with applications to project management, Unpublished PhD Thesis, , Stanford University.

Chi, C S-F (2010) How host country and transnational institutions interact on international infrastructure projects in less developed countries: Case studies of high-speed rail projects in China and Taiwan, Unpublished PhD Thesis, , Stanford University.

Christiansen, T R (1994) Modeling efficiency and effectiveness of coordination in engineering design teams, Unpublished PhD Thesis, , Stanford University.

Clevenger, C M (2010) Design guidance: Assessing process challenge, strategy, and exploration, Unpublished PhD Thesis, , Stanford University.

Domingo, L (2023) Influence of method and media interventions in creative remote design team collaboration, Unpublished PhD Thesis, , Stanford University.

Dong, N (2012) Automated look-ahead schedule generation and optimization for the finishing phase of complex construction projects, Unpublished PhD Thesis, , Stanford University.

Ekstrom, M A (2002) Accounting for rater credibility when evaluating construction industry service providers, Unpublished PhD Thesis, , Stanford University.

El-Bibany, H E-D (1992) Architecture for human-computer design, management and coordination in a collaborative AEC environment, Unpublished PhD Thesis, , Stanford University.

Fergusson, K J (1993) Impact of integration on industrial facility quality, Unpublished PhD Thesis, , Stanford University.

Fischer, M A (1991) Using construction knowledge during preliminary design of reinforced concrete structures, Unpublished PhD Thesis, , Stanford University.

Flint, M M (2014) A modular framework for performance-based durability engineering, Unpublished PhD Thesis, , Stanford University.

Frank, M (2017) Uncovering hidden demands of global learners: Mind and body in a PBL context, Unpublished PhD Thesis, , Stanford University.

Froese, T M (1992) Integrated computer-aided project management through standard object-oriented models, Unpublished PhD Thesis, , Stanford University.

Fuyama, H (1993) Computer assisted conceptual structural design of steel buildings, Unpublished PhD Thesis, , Stanford University.

Gane, V (2011) Design scenarios methodology: enabling requirements-driven design spaces, Unpublished PhD Thesis, , Stanford University.

Gao, J (2011) A characterization framework to document and compare BIM implementations on construction projects, Unpublished PhD Thesis, , Stanford University.

Garcia-Lopez, N P (2017) An activity and flow-based construction model for managing on-site work, Unpublished PhD Thesis, , Stanford University.

Gasparro, K E (2019) Crowdfunding our cities: Three perspectives on stakeholder dynamics during innovative infrastructure delivery, Unpublished PhD Thesis, , Stanford University.

Grey Rodriguez, F C (2019) Space-mate: A framework to harmonize occupant well-being and building sustainability, Unpublished PhD Thesis, , Stanford University.

Guikema, S D (2003) Optimal resource allocation in an engineering design team with asymmetric information, Unpublished PhD Thesis, , Stanford University.

Hall, D M (2017) The early stages of integrated project delivery: Institutionalization and impact on adoption of systemic innovations, Unpublished PhD Thesis, , Stanford University.

Hamledari, H (2021) Impact assessment of blockchain-enabled smart contracts on the visibility of construction payments, Unpublished PhD Thesis, , Stanford University.

Hampson, K D (1994) Technology strategy and competitive performance: A study of bridge construction, Unpublished PhD Thesis, , Stanford University.

Hansen, K L (1993) How strategies happen: An investigation of the decision to upgrade CAD/CIE in architectural, engineering, and construction firms, Unpublished PhD Thesis, , Stanford University.

Harkola, J (1995) Diffusion of construction technology: In a Japanese firm, Unpublished PhD Thesis, , Stanford University.

Hartmann, T (2008) A grassroots model of decision support system implementations by construction project teams, Unpublished PhD Thesis, , Stanford University.

Haymaker, J (2004) The perspective approach: Enabling engineers to construct and integrate views and generate an evolving project model, Unpublished PhD Thesis, , Stanford University.

Hinze, J W (1976) The effect of middle management on safety in construction, Unpublished PhD Thesis, , Stanford University.

Horii, T (2005) Impact of multiple normative systems on the organizational performance of international joint ventures, Unpublished PhD Thesis, , Stanford University.

Javernick Will, A N (2009) Mobilizing institutional knowledge for international projects: The relative importance, acquisition and transfer of institutional knowledge for international firms, Unpublished PhD Thesis, , Stanford University.

Jooste, S F (2010) Exploring the networks of organizations that enable and govern infrastructure public-private partnerships: An organizational field-level perspective, Unpublished PhD Thesis, , Stanford University.

Kam, C K H (2005) Dynamic decision breakdown structure: Ontology, methodology, and framework for information management in support of decision-enabling tasks in the building industry, Unpublished PhD Thesis, , Stanford University.

Kang, S-C (2006) Computer planning and simulation of construction erection processes using single or multiple cranes, Unpublished PhD Thesis, , Stanford University.

Khanzode, A R (2011) An integrated virtual design and construction and lean (IVL) method for coordination of mechanical, electrical and plumbing (MEP) systems, Unpublished PhD Thesis, , Stanford University.

Kim, J (2007) Temporary structure planning ontology, Unpublished PhD Thesis, , Stanford University.

Kim, J I (2016) Framework for dynamic generation and evaluation of excavation schedules for hard rock tunnels in preconstruction and construction, Unpublished PhD Thesis, , Stanford University.

Kim, J I (2014) Methodology for the application of BIM-based decision support methods to evaluate sustainability metrics for master plans of a large-scale development, Unpublished PhD Thesis, , Stanford University.

Kim, K (2002) Distributed coordination of project schedule changes: An agent-based compensatory negotiation approach, Unpublished PhD Thesis, , Stanford University.

  • Type: Thesis
  • Keywords: coordination; effectiveness; efficiency; measurement; construction project; conflicts; critical path method; negotiation; scheduling; subcontractor
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/250772925
  • Abstract:
    In the construction industry, projects are becoming increasingly large and complex, involving multiple subcontractors. Traditional centralized coordination techniques used by the general contractors become insufficient as subcontractors perform most work and provide their own resources. When subcontractors cannot provide enough resources, they hinder their own performance as well as that of other subcontractors and ultimately the entire project. Thus, construction projects need a new distributed coordination approach wherein all of the concerned subcontractors can respond to changes and reschedule a project dynamically. The focus of this research is rescheduling a project in a distributed manner in order to lower the sum of all participating subcontractors' extra costs associated with changes in their resource constraints, subject to the precedence relationships among project activities, without assuming that a central coordinator knows all the information needed for coordination and that subcontractors are benevolent. The challenges are to find a new distributed approach that enables subcontractors to compensate other affected subcontractors for disadvantageous agreements so that it enhances the global outcome while pursuing individual incentives; to identify schedule conflicts, consider alternatives; and resolve schedule conflicts in a tightly coupled network of related activities; and to preserve the work logic and ensure convergence of distributed computation. To meet the challenges, I developed a new distributed coordination framework for project schedule changes (DCPSC) and a novel agent-based compensatory negotiation (ABCN) methodology to enable the framework. The DCPSC-based ABCN methodology has met challenges fully by using novel definitions of utility-based schedule-change options, by employing new multi-linked negotiation protocols based on a shared project plan, and by introducing new mechanisms of directing message-passing based on the Critical Path Method (CPM). In addition to this theoretical work, I designed and implemented a new Java-based multi-agent prototype—distributed subcontractor agent system (DSAS)—to demonstrate the effectiveness of the DCPSC framework through a series of comparison tests, charrette tests, and measurements. DSAS solves the problems successfully. Thus, this research formalizes, implements, and tests the necessary steps to help subcontractors coordinate schedule changes in order to increase the efficiency of their resource use, which in turn enhances successful completion of whole projects.

Koo, B (2004) Formalizing construction sequence constraints for the rapid generation of scheduling alternatives, Unpublished PhD Thesis, , Stanford University.

Lee, Y (2020) A methodology to align the logistical requirements of prefabricated wall panels, Unpublished PhD Thesis, , Stanford University.

Li, W X (2015) A performance management methodology for collaborative design and construction project teams, Unpublished PhD Thesis, , Stanford University.

Liston, K M (2009) A mediated interaction approach to study the role of media use in team interaction, Unpublished PhD Thesis, , Stanford University.

Liu, R (2021) Impact of enhanced context-awareness for construction field crews on task cycle time, Unpublished PhD Thesis, , Stanford University.

Lo, T Y J (2021) Innovation management in the construction industry: Innovation performance indicators for AECOO organizations, Unpublished PhD Thesis, , Stanford University.

Mahalingam, A (2006) Understanding and mitigating institutional costs on global projects, Unpublished PhD Thesis, , Stanford University.

Martin, C E (1999) Riveting: Steel technology, building codes, and the production of modern places, Unpublished PhD Thesis, , Stanford University.

Mason, G E (1973) A quantitative risk management approach to the selection of construction contract provisions, Unpublished PhD Thesis, , Stanford University.

Min, J U (2004) Supply chain visualization through web services integration, Unpublished PhD Thesis, , Stanford University.

Mitropoulos, P (1996) Technology adoption decisions in construction organizations, Unpublished PhD Thesis, , Stanford University.

Morkos, R (2014) Operational efficiency frontier: Visualizing, manipulating, and navigating the construction scheduling state space with precedence, discrete, and disjunctive constraints, Unpublished PhD Thesis, , Stanford University.

Mourgues, C (2009) Method to produce field instructions from product and process models, Unpublished PhD Thesis, , Stanford University.

Ng, F P (2003) Quantity and pricing decisions in the presence of advance contracts, Unpublished PhD Thesis, , Stanford University.

Nikkhoo, P (2022) A systematic method to reduce the duration impact of change events on construction projects, Unpublished PhD Thesis, , Stanford University.

O'Brien, W J (1998) Capacity costing approaches for construction supply-chain management, Unpublished PhD Thesis, , Stanford University.

Orr, R J (2005) Unforeseen conditions and costs on global projects: Learning to cope with unfamiliar institutions, embeddedness and emergent uncertainty, Unpublished PhD Thesis, , Stanford University.

Peterman, A (2013) The roles within: Building energy conservation in the United States through alliance networks and other voluntary strategies, Unpublished PhD Thesis, , Stanford University.

Phan, D H D (1993) The primitive-composite (p-c) approach: A methodology for developing sharable object-oriented data representations for facility engineering integration, Unpublished PhD Thesis, , Stanford University.

Piao, Y (2020) Case studies to determine the effect of applying blockchain technology and building information modeling on the workflow of water infrastructure projects, Unpublished PhD Thesis, , Stanford University.

Porter, K A (2000) Assembly-based vulnerability of buildings and its uses in seismic performance evaluation and risk-management decision-making, Unpublished PhD Thesis, , Stanford University.

Salazar-Kish, J M (2001) Modeling concurrency tradeoffs and their effects on project duration and rework, Unpublished PhD Thesis, , Stanford University.

Sanvido, V E (1984) Designing productivity management and control systems for construction projects, Unpublished PhD Thesis, , Stanford University.

Senescu, R R (2011) Design process communication methodology, Unpublished PhD Thesis, , Stanford University.

Sheffer, D A (2011) Innovation in modular industries: Implementing energy-efficient innovations in us buildings, Unpublished PhD Thesis, , Stanford University.

South, A J (2019) Stakeholder network dynamics and the governance of public-private partnerships, Unpublished PhD Thesis, , Stanford University.

Staub-French, S A (2002) Feature-driven activity-based cost estimating, Unpublished PhD Thesis, , Stanford University.

Tatum, C B (1983) Decision-making in structuring construction project organizations, Unpublished PhD Thesis, , Stanford University.

Taylor, J E (2006) Three perspectives on innovation in interorganizational networks: Systemic innovation, boundary object change, and the alignment of innovations and networks, Unpublished PhD Thesis, , Stanford University.

Tomkins, C D (2008) Allocation and pricing of water resources, Unpublished PhD Thesis, , Stanford University.

Tommelein, I D (1989) SightPlan: an expert system that models and augments human decision making for designing construction site layouts, Unpublished PhD Thesis, Department of Civil Engineering, Stanford University.

Touran, A (1981) Construction operations data acquisition and processing via time-lapse photography interfaced to a minicomputer, Unpublished PhD Thesis, , Stanford University.

Vanegas Pabon, J A (1988) A model for design/construction integration during the initial phases of design for building construction projects, Unpublished PhD Thesis, , Stanford University.

Wang, Y-P (2021) How level of detail of activity duration data influences look-ahead schedule performance in prefabricated construction, Unpublished PhD Thesis, , Stanford University.

Waugh, L M (1990) A construction planner, Unpublished PhD Thesis, , Stanford University.

Williams, J M (1991) Interfaces: Integrating product design and process engineering in manufacturing and construction, Unpublished PhD Thesis, , Stanford University.